Crack mapping validation - Support Block D1

MT-2047 · Support Block D1 · created 2026-08-06

← Back to tasks

Task record

Task ID
MT-2047
Zone
Z-D1 — Support Block D1
Assignee
CAIC Engineering
Created
2026-08-06
Due date
2026-08-22
Progress
20%
Priority
Medium
Status
Assigned
Linked finding CR-044

Work instruction

Physical measurement of 12 AI-flagged cracks for AI validation.

Upload evidence

Before / after evidence

Before repair condition
Before — 2026-08-06
After repair condition
After — sealant applied, silica top coat restored

Activity history

  1. 2026-08-06Task created from approved finding Eng. Sok Dara
  2. 2026-08-05Assigned with priority and due date Eng. Chan Vibol
  3. 2026-08-08Progress updated to 20% CAIC Engineering
  4. 2026-08-09Awaiting CAIC verification CAIC Engineering