
Why inspections
The roof is surveyed in cycles — not by walking it
Every crack in the register traces back to one flight: its date, zone and image.
Read-only access — inspection planning is limited to engineers and administrators.
5
Cycles recorded
All surveys logged
5,702
Images captured
Across every flight
8/ 8
Zones covered
Full roof coverage
18 Aug
Next flight
Upcoming cycle
Drone RGB
18 m altitude, 80% overlap — millimetre detail.
Thermal
Flown after rain to reveal trapped moisture.
Manual check
Engineers measure cracks to calibrate the AI.
Completed cycles
Upload new data →INS-2026-014
ReviewedDrone RGB · 2026-08-02 · Central Spine B1, Concourse B2
- 1,842
- Img
- 2
- Area
- 95
- AI
- 71
- OK
INS-2026-013
ReviewedDrone RGB · 2026-07-28 · Terminal Roof A1, Terminal Roof A2
- 2,310
- Img
- 2.6
- Area
- 168
- AI
- 132
- OK
INS-2026-012
AnalyzedThermal · 2026-07-19 · Pier C1, Pier C2
- 640
- Img
- 1.5
- Area
- 61
- AI
- 38
- OK
INS-2026-011
ReviewedDrone RGB · 2026-06-30 · Support Block D1, Utility Roof D2
- 910
- Img
- 0.9
- Area
- 45
- AI
- 30
- OK
Scheduled next
How a cycle runs
Plan → Review pipeline- 1
Plan
Zones, method and flight window.
- 2
Capture
Drone or thermal survey.
- 3
Upload
Images go to Data Upload & AI.
- 4
Analyse
AI proposes suspected cracks.
- 5
Review
Engineers confirm and open tasks.