Crack CR-001

← Back to findings

Read-only view — engineering review is limited to CAIC engineers and administrators.

AI detection evidence

Original capture of crack CR-001
Original capture — Drone RGB
AI annotated detection for crack CR-001Crack 69%
AI annotation — bounding box and confidence

Branching crack running through the silica top coat between panel joints.

Ultralytics YOLO re-analysis

AI inference is limited to engineers and administrators.

Engineering review workflow

Your role cannot confirm, reject or action findings — the decision stays with CAIC engineering.

Reviewing engineer

Eng. Chan Vibol

Recommendation

Immediate sealing and re-coating; verify with water test after repair.

Finding record

Crack ID
CR-001
Zone
Z-A1 — Terminal Roof A1
Width
1.1 mm
Length
2 m
AI confidence
69%
Detected
2026-02-04
Method
Drone RGB
Severity
High
Status
Verified
View zone on roof map →

Linked maintenance

Seal 2.4 mm joint crack - Terminal Roof A1

MT-2041 · Roof Maintenance Team A · due 2026-08-14

In Progress
Example of a sealed roof crack after repair

Example after-repair evidence photo.

AI analysis history for this finding

No Ultralytics YOLO runs recorded yet — every analysis is logged here automatically.