Repair leakage point above gate C1-04

MT-2045 · Pier C1 · created 2026-07-21

← Back to tasks

Task record

Task ID
MT-2045
Zone
Z-C1 — Pier C1
Assignee
Roof Maintenance Team B
Created
2026-07-21
Due date
2026-08-06
Progress
100%
Priority
High
Status
Completed
Linked finding CR-032

Work instruction

Full membrane patch, verify with water test.

Upload evidence

Before / after evidence

Before repair condition
Before — 2026-07-21
After repair condition
After — sealant applied, silica top coat restored

Activity history

  1. 2026-07-21Task created from approved finding Eng. Sok Dara
  2. 2026-08-05Assigned with priority and due date Eng. Chan Vibol
  3. 2026-08-08Progress updated to 100% Roof Maintenance Team B
  4. 2026-08-09Awaiting CAIC verification CAIC Engineering