Crack CR-036

Pier C2 · detected 2026-02-01 · Manual

← Back to findings

AI detection evidence

Original capture of crack CR-036
Original capture — Manual
AI annotated detection for crack CR-036crack 62%
AI annotation — bounding box and confidence

Linear crack along panel joint, water staining observed after rainfall.

Engineering review workflow

Create maintenance task

Reviewing engineer

Eng. Sok Dara

Recommendation

Immediate sealing and re-coating; verify with water test after repair.

Finding record

Crack ID
CR-036
Zone
Z-C2 — Pier C2
Width
2 mm
Length
1.5 m
AI confidence
62%
Detected
2026-02-01
Method
Manual
Severity
High
Status
Rejected
View zone on roof map →

Linked maintenance

No maintenance task created yet for this finding.

Example of a sealed roof crack after repair

Example after-repair evidence photo.