Crack CR-033

Pier C2 · detected 2026-06-19 · Drone RGB

← Back to findings

AI detection evidence

Original capture of crack CR-033
Original capture — Drone RGB
AI annotated detection for crack CR-033crack 77%
AI annotation — bounding box and confidence

Linear crack along panel joint, water staining observed after rainfall.

Engineering review workflow

Create maintenance task

Reviewing engineer

Eng. Chan Vibol

Recommendation

Immediate sealing and re-coating; verify with water test after repair.

Finding record

Crack ID
CR-033
Zone
Z-C2 — Pier C2
Width
1.1 mm
Length
0.4 m
AI confidence
77%
Detected
2026-06-19
Method
Drone RGB
Severity
High
Status
Verified
View zone on roof map →

Linked maintenance

No maintenance task created yet for this finding.

Example of a sealed roof crack after repair

Example after-repair evidence photo.