Task details
How it works
- 1A finding is confirmed by a CAIC engineer in the crack register.
- 2A work order is created here and assigned to a maintenance team.
- 3The team uploads before/after evidence from the field.
- 4CAIC engineering verifies, updates or deletes the task.