Crack CR-019

← Back to findings

Read-only view — engineering review is limited to CAIC engineers and administrators.

AI detection evidence

Original capture of crack CR-019
Original capture — Drone RGB
AI annotated detection for crack CR-019Repaired patch 87%
AI annotation — bounding box and confidence

Previously repaired patch on the roof walkway; monitor for re-deterioration at the edges.

Ultralytics YOLO re-analysis

AI inference is limited to engineers and administrators.

Engineering review workflow

Your role cannot confirm, reject or action findings — the decision stays with CAIC engineering.

Reviewing engineer

Eng. Kim Puthea

Recommendation

Immediate sealing and re-coating; verify with water test after repair.

Finding record

Crack ID
CR-019
Zone
Z-C2 — Pier C2
Width
0 mm
Length
0.6 m
AI confidence
87%
Detected
2026-06-04
Method
Drone RGB
Severity
High
Status
Verified
View zone on roof map →

Linked maintenance

No maintenance task created yet for this finding.

Example of a sealed roof crack after repair

Example after-repair evidence photo.

AI analysis history for this finding

No Ultralytics YOLO runs recorded yet — every analysis is logged here automatically.