Crack CR-011

Terminal Roof A2 · detected 2026-05-07 · Drone RGB

← Back to findings

AI detection evidence

Original capture of crack CR-011
Original capture — Drone RGB
AI annotated detection for crack CR-011crack 67%
AI annotation — bounding box and confidence

Linear crack along panel joint, water staining observed after rainfall.

Engineering review workflow

Create maintenance task

Reviewing engineer

Eng. Kim Puthea

Recommendation

Add to monitoring list; re-inspect in the next inspection cycle.

Finding record

Crack ID
CR-011
Zone
Z-A2 — Terminal Roof A2
Width
2.5 mm
Length
3 m
AI confidence
67%
Detected
2026-05-07
Method
Drone RGB
Severity
Low
Status
Confirmed
View zone on roof map →

Linked maintenance

No maintenance task created yet for this finding.

Example of a sealed roof crack after repair

Example after-repair evidence photo.