Crack CR-009

Terminal Roof A2 · detected 2026-03-01 · Drone RGB

← Back to findings

AI detection evidence

Original capture of crack CR-009
Original capture — Drone RGB
AI annotated detection for crack CR-009crack 89%
AI annotation — bounding box and confidence

Linear crack along panel joint, water staining observed after rainfall.

Engineering review workflow

Create maintenance task

Reviewing engineer

Eng. Chan Vibol

Recommendation

Immediate sealing and re-coating; verify with water test after repair.

Finding record

Crack ID
CR-009
Zone
Z-A2 — Terminal Roof A2
Width
2.9 mm
Length
3.6 m
AI confidence
89%
Detected
2026-03-01
Method
Drone RGB
Severity
High
Status
Verified
View zone on roof map →

Linked maintenance

No maintenance task created yet for this finding.

Example of a sealed roof crack after repair

Example after-repair evidence photo.