AI detection evidence

crack 97%Linear crack along panel joint, water staining observed after rainfall.
Engineering review workflow
Reviewing engineer
Eng. Chan Vibol
Recommendation
Schedule repair within the current maintenance cycle and monitor after rainfall.
Finding record
- Crack ID
- CR-005
- Zone
- Z-A1 — Terminal Roof A1
- Width
- 0.7 mm
- Length
- 0.8 m
- AI confidence
- 97%
- Detected
- 2026-06-16
- Method
- Drone RGB
- Severity
- Medium
- Status
- Repaired
Linked maintenance
No maintenance task created yet for this finding.

Example after-repair evidence photo.