← Back to findings
Read-only view — engineering review is limited to CAIC engineers and administrators.
AI detection evidence

Seam/joint defect 76%Crack with dirt ingress along the parapet/wall junction — sealant failure suspected.
Ultralytics YOLO re-analysis
AI inference is limited to engineers and administrators.
Engineering review workflow
Your role cannot confirm, reject or action findings — the decision stays with CAIC engineering.
Reviewing engineer
Eng. Lim Sreyneang
Recommendation
Schedule repair within the current maintenance cycle and monitor after rainfall.
Finding record
- Crack ID
- CR-002
- Zone
- Z-A1 — Terminal Roof A1
- Width
- 2.2 mm
- Length
- 3.7 m
- AI confidence
- 76%
- Detected
- 2026-03-07
- Method
- Drone RGB
- Severity
- Medium
- Status
- AI Suspected
Linked maintenance
No maintenance task created yet for this finding.

Example after-repair evidence photo.
AI analysis history for this finding
No Ultralytics YOLO runs recorded yet — every analysis is logged here automatically.